Service: | ESTIMATE - FOUNDATION DRIP change If you have an existing system, we will measure your foundation perimeter, check your existing controller to see if it has the extra capacity for an additional zone, determine the number of sidewalks, etc. to bore underneath, and determine the placement of the new drip zone valve. We will provide you a quote on the spot, with complete technical details and sketch of the proposed drip line pathway. If you don't have a system, we will provide you with a quote for a new, foundation-only drip zone, with full technical details and a sketch of the proposed system. |
---|---|
Staff: | Mario Gomez |
Date/time: | Choose one of the openings below. (CDT) |
Previous | Sun Apr 21 | Mon Apr 22 | Tue Apr 23 | Wed Apr 24 | Thu Apr 25 | Fri Apr 26 | Sat Apr 27 | Next |
---|---|---|---|---|---|---|---|---|
There are no openings for the week of April 21. Next opening is Monday, April 29. |